Helical piles supplier — Xiamen Honor Energy manufactures ground screws for solar ground mounting structures. They go straight into the soil, with the mounting structure bolted on top through the flange. Hot-dip galvanized, so they hold up in sand, clay, and backfill. Quick to install, work on different terrain, recyclable, and rated for 25+ years.

Xiamen Honor Energy makes ground screws that act as the foundation for solar ground-mount systems. The process is straightforward: drive it into the soil with specialized equipment, then bolt the mounting rail directly to the top flange. It replaces traditional concrete footings, skipping excavation, pouring, and curing—the mounting structure can go up the same day. For soil types, it performs best in sandy loam, silty clay, and backfill—soft to medium-dense ground. Coastal salt spray and humid conditions are fine too. Hard clay and gravelly sites work with pre-drilling; pure rock or permafrost is not recommended .

Advantages

1. Fast: An experienced crew can install several hundred per day; rails go up same-day, cutting the project timeline vs. concrete.

2. Soil-flexible: Works in sand, clay, and gravel—swap helix or adjust length to match.

3. Corrosion-resistant: Thick hot-dip galvanizing holds up in coastal salt spray, rated for a 25+ year lifespan.

4. Eco-friendly: No construction waste; removable and recyclable at the end of the project, low land restoration cost.

5. Strong load capacity: Helix compacts surrounding soil, delivering solid pull-out and compression resistance.

Helical Pile 

Technical Specifications

Item

Spec

Material

Q235B Carbon Steel

Finish

Hot-Dip Galvanized (≥65 μm avg)

Common Diameter

76mm

Common Length

1200–3500mm (Customizable)

Flange Diameter

200 mm / 220 mm

Helix Config

Single / Double / Multi-Helix Available

Soil Suitability

Sandy Loam, Silty Clay, Backfill, Gravelly Soil (Pre-drill for Hard Ground)

 

Design Life

25+ Years

Helical Pile

FAQ

Q: How long does it take to install one? 

A: With a dedicated driver, about 2-3 minutes per screw under normal conditions. A crew can do several hundred a day—way faster than waiting for concrete to cure.

Q: My site is hard clay—will it work? 

A: Yes, but pre-drill first. Hard clay creates too much resistance; driving directly risks snapping the helix or stalling. Drill a pilot hole slightly smaller than the shaft, then screw in. Rocky ground is not recommended—it chews up equipment.

Q: What's the difference between hot-dip and regular galvanizing? 

A: Hot-dip is much thicker and bonds better—typically 65 μm+. It holds up 20-30 years in coastal salt spray or wet soil. Regular electroplating is thin and flakes off outdoors within a few years. Solar plants are designed for 25+ years; the foundation isn't where you cut corners

Hot Tags: Helical Pile
Send Inquiry
Contact Info
Ready to order? Xiamen Honor Energy's China factory provides competitive pricing and design feedback for Solar Ground Mount, Solar Roof Mount, Solar Carport Mount, catering to OEM.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
RejectAccept